Site Installation & Steel Construction - Oil & Gas Equipment

Site Installation & Maintenance

We offer complete installation of plants, including mechanical. electrical. instrumental, and pneumatic parts.  We also offer partial installation, plant maintenance, and dismantling and re-location of plants.

CHEMICAL & PETROCHEMICAL INDUSTRY

Complete Installation of a new HF Plant
Complete Installation of a new DF Plant

FOOD INDUSTRY

Olive Oil Processing plant

CONDITIONING & AIR TREATMENT PLANTS

PHARMACEUTICAL INDUSTRY

Complete installation of a new pharmaceutical plant.
(Mechanical, Electrical, Instrumental & Pneumatic Parts)

SHIP MANUFACTURING INDUSTRY

Complete installation of the engine and piping, prefabrication and installation of the piping in material AISI 316L of the following units:
– Gas loading plant
– Liquefaction unit
– Nitrogen plant
Safe discharge unloading system, Methane storage, Vapour plant, Sea water circuit.
NDT: 100% RX
Design pressure: 380 bar

SHIP MANUFACTURING INDUSTRY

THERMOELECTRIC SECTOR

Substitution works of the main header SH2
Supply and installation of the heating coils SH2
Location: Tirreno Power, Vado Ligure (SV)

site installation 2
site installation 3
site installation 4
SiteInstallation4
SiteInstallation2
SiteInstallation3
SiteInstallation6

Steel Construction

Our Steel Construction offers Cleanroom Structural Steel and Scrubber Structural Steel.  We offer onsite fabrication, assembly, coating, testing and erection work for steel structures, pipes, bridges, silos, ducting and tanks.  Our steel work construction includes rails, tubing and steel platforms.

SteelConstrction1
SteelConstruction2
SteelConstruction3.jpg
SteelConstruction4
SteelConstruction5
SteelConstruction6

This example project uses 8,000 tons of Cleanroom Structural Steel, and 1,800 tons of Scrubber & Platform Structural Steel.

It is an assembly of a cell system for electrolysis, weighing a total of 1,000 Tons. The weight of the cells varies between 10.7 and 17 Tons per unit, including insulated supports.

Production and installation of steel constructions for main electrolysis structures, includes purlines, tie beams, crane girders, main portals, frames and crane rails, weighing a total of 6,150 Tons.

Production and assembly of Dehydrated Carnallite with a diameter of 12M, a height of 31.7M and a weight of 133 Tons per unit are supported by steel construction bases, weighing 110 tons per silo.

The production and assembly of piping bridges weighs 3,300 tons.

© 2015 Oil & Gas Equipment